Facilities Planning and Construction

2019 Bond

    • Baytown JS-Installation of cap sheet almost completed

    • Gentry JS-Installation of cap sheet almost completed

    • Education Service Center Phase 1 main lobby.

    • Education Service Center Phase 1 Special Education cubicle offices.

    • Education Service Center Fitness Center Restroom

    • Education Service Center Wellness Center-Painting is underway

    • Demolition and abatement of rear medical building is in progress.

    • Metal framing and gypsum install is completed at the 2nd floor. Ceiling grid installation is underway.

    • Education Service Center Phase 1- Floors are being prepped for vinyl flooring and millwork installation is underway.

    • Education Service Center Phase 1- Terrazzo flooring installation is being finalized, final interior painting yet to be complete.

    • Aerial view of site work underway.

    • Rough grading throughout entire site.

    • E.F. Green 1st concrete pour on 7-10-20.

    • E.F. Green Aerial view of site: Parking lot poured, concrete prep work underway for bus and parent lanes

    • E.F. Green Junior School-Foundation footing installation underway, and underground plumbing system in progress.

    • E.F. Green concrete and structural steel at academic building.

    • E.F. Green grade beam installation at Fine Arts/Athletics building.

    • E.F. Green parking lots and drives substantially complete.

    • E.F. Green structural steel continues at academic building.

    • E.F. Green Mechanical Ducts Installed

    • E.F. Green Plumbing Top-Out Progresses Student Restrooms

    • E.F. Green Beam Signing

    • E.F. Green Signed Beam Installed

    • E.F. Green JS installation of interior frames is underway

    • E.F. Green Junior School exterior frames and sheathing progress

    • E.F. Green Aerial View- lightweight concrete poured at rooftop

    • E.F. Green Installation of sheathing and waterproofing progresses

    • E.F. Green Interior metal framing continues in Building A & B

    • E.F. Green MEP systems progress on second floor

    • E.F. Green masonry installation at academic wings.

    • E.F. Green sheathing installation at Fine Arts building.

    • E.F. Green gypsum board installation progresses along corridor.

    • E.F. Green MEP systems progresses at Athletics and Fine Arts Bldg.

    • E.F. Green Junior School overall aerial view of site.

    • E.F. Green Junior School shotput and discus platform

    • E.F. Green Junior School metal panel installation at building perimeter.

    • E.F. Green Junior School millwork installation in classrooms.

    • E.F. Green Junior School-Grading and forming for sidewalks

    • E.F. Green Junior School-Box culverts tied into Harris Co. detention pond

    • GCCISD ES No. 17-Building pad installation is complete

    • GCCISD ES No. 17 Final grading underway in preparation of concrete pour at parking lot

    • GCCISD ES No. 17- Plumbing rough-in underway throughout entire building pad

    • GCCISD E.S. no. 17 concrete pad and driveway nearly complete.

    • GCCISD Elementary #17 overall aerial view of site

    • GCCISD Elementary #17 domestic water line and fire line vault and meter box

    • Jessie Lee Pumphrey Elementary clerestory framing at collaborative area.

    • Jessie Lee Pumphrey Elementary lightweight concrete installation at roof.

    • Jessie Lee Pumphrey ES- Brick installation complete at building

    • Jessie Lee Pumphrey ES- Metal panels scheduled to be installed in October

    • Jessie Lee Pumphrey ES- Ceramic tile installation underway in corridors

    • Jessie Lee Pumphrey ES-Millwork installation underway in the classrooms

    • Jessie Lee Pumphrey ES-Accent painting progressing at Media Center

    • Jessie Lee Pumphrey ES- Aerial view of campus

    • Jessie Lee Pumphrey ES-Millwork installed in teacher workroom

    • Jessie Lee Pumphrey ES-Plumbing fixtures being installed in restrooms

    • Jessie Lee Pumphrey-Carpet installation complete at gym

    • Jessie Lee Pumphrey-Flooring and wall graphic installation

    • Jessie Lee Pumphrey-Early Learning Academy Exhibit installation nearly complete

    • Jessie Lee Pumphrey ES-Project is substantially complete, GC working on punchlist items

    • Lee High School-Armstrong Auditorium-Rigging system currently being demolished

    • Lee High School-Armstrong Auditorium-Ticket booth framed out and new terrazzo floor installed

    • Lee High School-Armstrong Auditorium-Gypsum installation nearly complete in lobby area

    • Lee High School-Armstrong Auditorium-Tile installation complete in restroom

    • Lee HS new ceiling and sprinkler system installed throughout.

    • Gentry JS Fine Arts-Soil compacting nearly complete at new parking lot

    • Lee HS Fine Arts-Building pad being prepared for select fill

    • Gentry JS Fine Arts-New parking lot and detention pond expansion

    • Lee HS Fine Arts-Stormwater, water, and sewer installation

    • Gentry JS Fine Arts-Demolition of interior spaces complete, plumbing rough-in is underway

    • Lee HS Fine Arts- Drilled piers placement underway

    • Gentry JS Fine Arts-New Band Hall Space

    • Lee HS Fine Arts-Structural steel being erected

    • Gentry JS Fine Arts-Orchestra Hall is substantially completed

    • Lee HS Fine Arts-MEP systems top-out is underway

    • Lee HS Fine Arts-MEP systems top-out continues

    • Lee HS Fine Arts-Exterior sheathing installation is underway at the Band Hall area

    • Lee HS Fine Arts-Gypsum board taping and floating is ongoing

    • Lee HS Fine Arts-Tile has been installed at first floor restrooms

    • San Jacinto Replacement-Building pad installation is complete

    • San Jacinto ES- Moisture barrier installed in preparation of concrete pour at Area D of building pad

    • San Jacinto ES- Plumbing rough-in underway throughout entire building pad

    • San Jacinto Elementary Replacement overall aerial view of site

    • San Jacinto Elementary Replacement structural steel of main entry of building

    • San Jacinto Elementary Replacement metal decking installation

    • San Jacinto Elementary joist installation at first floor near entrance.

    • San Jacinto Elementary parent drive poured near front entry.

    • San Jacinto ES-Aerial View-Roof ready for lightweight concrete

    • San Jacinto ES- Brick installation progresses at East side of building

    • San Jacinto ES-Rigid insulation underway at West side of building

    • San Jacinto ES-Gypsum installation continues in corridors

    • San Jacinto ES-Millwork installation underway in the classrooms

    • San Jacinto ES-Decorative light fixtures installed at commons area

    • San Jacinto ES-Masonry installation underway at building entrance

    • San Jacinto ES-Kitchen equipment installation is underway

    • San Jacinto ES-Storefront glazing system installation nearly complete

    • San Jacinto ES-Flooring and wall graphic installation

    • San Jacinto ES-Terrazzo flooring installation at rotunda

    • San Jacinto ES- Early Learning Academy Exhibit installation nearly complete

    • San Jacinto ES-Project is substantially complete, GC working on punchlist items

      • Excavation of new detention pond is complete.

      • Aerial view of new queuing lane. (Caldwell St.)

      • Site Improvement-Baytown J.S. Queueing Lane and Parking

    • Sterling HS MEP Package #1-Fire sprinkler line installation continues in hallways

    • Sterling HS MEP Package #1- Insulation of ductwork continues in classrooms

    • Sterling HS MEP Package #1-Exisisting conduit supported in corridor

    • Sterling HS MEP Package #1-Wall demolished in women's restroom

    • Sterling HS MEP Package #1- Cement board installed in restrooms

    • Sterling HS MEP Package #1- Ductwork tied into VAV boxes

    • Sterling HS MEP Package #1-Fixtures and partitions installed in restrooms

    • Sterling HS MEP Package #1-Final cleaning complete in classrooms

    • Sterling HS MEP Package #1-Installation of Air Handling Unit E1

    • Sterling HS MEP Package #1-Sanitary and Vent Piping a 2nd Floor Restroom

    • Sterling HS MEP Package #1-Ceiling grid installation in corridor

    • Sterling HS MEP Package #1-Medium pressure ductwork installation in Bio/Chem lab

    • Sterling HS MEP-Abatement and demolition of ductwork

    • Sterling HS MEP-Demolition of Air Handler Unit

    • Sterling HS MEP Package #1-Hard ceiling installation is underway in classrooms

    • Sterling HS MEP Package #1-Ceramic tile installation nearly complete in restrooms

    • Sterling HS MEP #1-Sprinkler heads and speaker installation underway at band hall

    • Sterling HS MEP #1-Toilet partitions installation complete in restrooms

    • Junior School Running Tracks-Gentry JS-Rough grading of running track

    • Junior School Running Tracks-Horace Mann JS-Rough grading of track

    • Junior School Running Tracks-Gentry JS- Concrete curb placement underway.

    • Highlands JS framing for concrete curbs.

    • Gentry JS synthetic track surface.

    • Baytown JS-track grading completed

    • Highland JS-Track grading completed

    • Junior School Running Tracks-Baytown JS-Asphalt base complete

    • Baytown JS Running Tracks- Track surface painted

    • SCTHS Phase 3- New Greenhouse

    • SCTHS Phase 3 Overhead electrical work.

    • Exterior of Automotive Academies Building is complete.

    • Installation of new grease trap is underway.

    • SCTHS Phase 3- Cafeteria Renovations

    • SCTHS Phase IV First Floor Plan Design Progress

    • SCTHS Phase IV Second Floor Plan Design Progress

    • SCTHS Phase IV Exterior Rendering- Design Progress

    • SCTHS Phase IV Night Rendering-Design Progress

    • SCTHS Phase 3 New cafeteria dining area

    • SCTHS Phase 3 New computer lab in the West Building

    • Stuart CTHS Phase 3 Cafe/Commons area.

    • Stuart CTHS Phase 3 cafeteria.

    • Stuart CTHS Phase 3 computer lab.

    • Stuart CTHS Phase 3 Green House.

    • Stuart CTHS Phase 3 Transportation Academies Building; Auto Technology.

    • Stuart CTHS Phase 3 Veterinary Tech Lab.

    • Stuart CTHS Phase 4-Building pad installation complete

    • Stuart CTHS Phase 4-Underground site utility work is underway

    • SCTHS Phase 4-Aerial View-new concrete driveway poured; perimeter grade beams complete

    • Stuart CTHS Phase 4 mechanical, electrical, and plumbing top-out continues at first and second level

    • Stuart CTHS Phase 4 overall aerial view of site plan

    • Stuart Career Tech HS P4 brick installation at south wall.

    • Stuart Career Tech HS P4 framing at second floor atrium.

  • 0:00 / 0:00

  • 0:00 / 0:00

  • 0:00 / 0:00

  • 0:00 / 0:00

  • 0:00 / 0:00